Project Delivery Methods • Design-bid-build – Negotiated team • Construction management – CM as Advisor, CM as Agent – CM as Constructor • Design-build – Design-build as Developer • Bridging Entities – Principal/Owner, Agent, 3rd Party/Prime. Others – Advisor, Subs, Consultants…
read moreEstablish an NCARB record with AXP First of all getting an NCARB account is crucial for registration. The earlier you get this, the earlier you can start taking exams and logging hours under an architect as an intern. Most people wait until they…
read moreThere is a lot of information out there on the internet to study for the exam. I have been studying a while and have found quite a few resources and blogs. Some just cover one section specifically or just have notes for…
read moreWhen trying to describe to someone which way the down swings, this can be handy, or more confusing. But its always good to know terminology, b/c you never know what is going to show up on a test.
read moreCommon pitfalls and tips: Not putting in grade line. Slab 6 inch above finish grade. fire walls to not extend all the way up to the underside of the roof decking. allow for 8in for light, then mechanical space, then structure/joist. Put…
read moreOur model is based on a few basic common factors: 1. Preparation of construction documents is first because architects prepare a lot of CDs and have experience around the office. 2. SDP is second because it is considered an easy exam. Building…
read moreStructures Trig Basics The Story of Sohcahtoa http://prezi.com/cwvgfnajrz3s/?utm_campaign=share&utm_medium=copy&rc=ex0share
read moreHow to find the Resultant of 4 Forces (Example #4 in Kaplan 2012 SS study guide)
read moreHow to Find Resultant of Three Forces (Problem 3)
read moreHow to find the Resultant of Two Forces (Problem 2)